• 28

Grupo R wins contract for two shallow water platforms

Grupo R was assigned a contract for the engineering, procurement, construction, loading, mooring, transport and installation of two drilling platforms in the Gulf of Mexico last week.
Construction will take place at the Bosnor shipyard situated alongside the Pánuco River in Tampico, Tamaulipas.

2018-10-11T14:11:39+00:00 May 30, 2018|News Releases|0 Comments